Business continuity means maintaining essential operations without significant interruption. During office relocations, this becomes challenging because the physical infrastructure supporting your business is literally being moved from one location to another.
| Key Takeaways |
| Business continuity requires specialized planning: IT systems are critical infrastructure that cannot tolerate extended downtime during relocations |
| Separate IT planning is essential: Technology moves require different timelines, expertise, and coordination than physical furniture relocation |
| Pre-move infrastructure setup prevents downtime: Installing internet, cabling, and systems before moving equipment keeps business operations running |
| Professional expertise reduces risk: Experienced IT relocation specialists understand equipment sensitivity, proper handling, and system dependencies |
| Phased approaches maintain operations: Strategic staging allows businesses to continue functioning throughout the transition |
| Documentation and testing prevent problems: Comprehensive planning, labeling, and post-move validation catch issues before they impact production |
Business continuity means maintaining essential operations without significant interruption. During office relocations, this becomes challenging because the physical infrastructure supporting your business is literally being moved from one location to another.
What’s at Stake:
Every hour of system downtime translates to lost productivity across your organization. Customer-facing services depend on functioning IT systems. Critical business processes cannot wait for extended equipment setup. Data loss from improper handling can be catastrophic and permanent.
Why Office Moves Threaten Continuity:
IT systems are physically relocated to new locations. Network connectivity must be re-established from scratch. Server rooms require proper environmental setup before equipment arrives. Workstations need functioning network connections and power. Phone systems must be operational for customer communication.
Environmental Sensitivity:
IT equipment requires climate-controlled transport to prevent damage from temperature extremes and humidity. Hard drives and servers are sensitive to physical shock during movement. Static electricity can damage sensitive electronic components. Power interruptions must be managed carefully during shutdown and startup.
Complex Interdependencies:
Servers depend on storage systems for data access. Networking equipment must be operational before servers can function. Workstations require network connectivity to access resources. Phone systems rely on internet connectivity or dedicated circuits. Applications depend on databases and authentication systems.
Timing and Sequencing:
Infrastructure must be installed before equipment arrives. Systems must be brought online in specific sequences. Testing and validation require time before production use. Employees cannot work until their systems are fully functional.
Why IT Needs Different Timeline:
Network cabling installation takes weeks to complete. Internet service providers require advance notice for installation. Server room environmental systems need setup and testing time. Phone system installation and programming requires coordination. All infrastructure should be ready before moving production equipment.
Recommended IT Planning Phases:
| Phase | Timing | Key Activities |
| Infrastructure Planning | 8-12 weeks before | Internet ordering, cabling design, server room planning |
| Infrastructure Installation | 4-6 weeks before | Cabling installation, internet setup, phone system installation |
| Testing and Validation | 2-3 weeks before | System testing, connectivity verification, load testing |
| Equipment Move | Move weekend | Physical transport of servers and workstations |
| Production Cutover | Days after move | Final testing, validation, go-live |
Critical Documentation:
Network topology showing how systems connect. IP addressing schemes and VLAN configurations. Server dependencies and application relationships. Storage connections and SAN fabric layouts. Backup systems and procedures. Phone system configurations. Internet and WAN circuit details.
Why Documentation Matters:
You’ll need to recreate your environment in the new location. Problems are easier to troubleshoot with complete documentation. Configuration backups allow quick restoration if issues occur. Documentation ensures nothing is forgotten during setup.
New Location Infrastructure Checklist:
Install network cabling to all workstation locations and server room. Connect internet circuits and verify connectivity. Set up phone system infrastructure and test calling. Prepare server room with adequate power, cooling, and security. Install and test wireless access points. Verify all systems before scheduling equipment move.
Why This Prevents Downtime:
Equipment arrives to fully functional infrastructure. No waiting for internet installation after move day. Systems can be brought online immediately after physical placement. Problems are discovered and fixed before production equipment arrives.
Backup Requirements:
Full backups of all servers and critical systems. Database backups with current transaction logs. Configuration exports from all network devices. Verified backups through test restore operations. Backups stored separately from equipment being moved.
Why Backups Are Non-Negotiable:
Equipment can be damaged during transport. Human errors occur during disconnection and reconnection. Data corruption can happen during improper shutdowns. Backups are your recovery path if major problems occur.
Pre-Move Testing:
Internet connectivity at expected speeds. Network connectivity between all zones. Server to storage communication. Workstation to server access. Phone system functionality. Wireless coverage throughout space. All tests with actual equipment, not assumptions.
Strategic Timing Benefits:
Moving during evenings or weekends reduces impact on business operations. Extended time windows allow for problems to be resolved without pressure. Employees aren’t waiting while systems are being set up. Testing can occur without disrupting work.
Planning Considerations:
Ensure adequate IT staff available during off-hours moves. Have vendor support contacts available if needed. Plan for adequate time—don’t compress schedules unrealistically. Consider if your business truly has “off-hours” or operates continuously.
Department-by-Department Moves:
Move one department at a time over multiple weekends. Each phase is smaller and more manageable. If problems occur, impact is limited to one department. Lessons from early phases improve later phases. Most of the organization continues normal operations.
Parallel Operations During Transition:
Maintain systems at old location while bringing up new location. Run parallel until new systems are validated. Cutover to new location once everything is tested. Old location serves as fallback if major issues occur.
Continuity Through Flexibility:
VPN access allows employees to work during office transition. Cloud services remain accessible regardless of physical location. Critical staff can work remotely while systems are being moved. Business operations continue even with some physical disruption.
Systematic Shutdown Process:
Close all applications and save open work. Shut down systems following proper procedures, never just pulling power. Power down in correct sequence respecting dependencies. Allow systems adequate time to complete shutdown processes. Document shutdown process for reference during startup.
Why Proper Shutdown Matters:
Improper shutdowns can corrupt databases and file systems. Hard drives can be damaged by sudden power loss. Running systems suffer shock damage during transport. Proper shutdown protects data integrity.
Professional Handling Requirements:
Climate-controlled vehicles for all IT equipment. Proper padding and securing to prevent shock damage. Anti-static protection for sensitive components. Servers may remain in racks for better protection during transport. Critical equipment transported separately from general office items.
Chain of Custody:
Maintain security oversight of equipment throughout transport. Track high-value and sensitive equipment continuously. Document equipment condition before and after transport. Never leave loaded vehicles unattended with IT equipment.
Specialized Expertise Benefits:
Experience handling sensitive IT equipment properly. Understanding of equipment weight and balance. Knowledge of proper disconnection and reconnection procedures. Appropriate tools and equipment for safe handling. Insurance coverage for equipment value.
Proper Power-Up Order:
Verify all physical connections before applying power. Bring up network infrastructure first. Start storage systems before servers that depend on them. Power up core infrastructure services like DNS and authentication. Start application servers that depend on core services. Finally connect and test workstations.
Why Sequence Matters:
Systems brought online in wrong order may fail to start properly. Dependencies must be satisfied before dependent systems start. Starting everything simultaneously can cause configuration issues. Systematic approach makes troubleshooting easier if problems occur.
Testing Requirements:
Verify all hardware powers on successfully. Check that network connectivity functions. Test access to storage and data. Confirm application functionality. Validate backup systems operate correctly. Test phone system operations. Verify internet and external connectivity.
User Acceptance Testing:
Have actual users test systems with real work tasks. This catches problems technical testing might miss. Verify common workflows function properly. Ensure systems perform adequately under load.
Initial Operation Monitoring:
Watch system performance metrics carefully. Monitor network traffic and bandwidth utilization. Check error logs for unusual activity. Track user-reported issues systematically. Compare performance to baseline at old location.
Quick Issue Resolution:
Address problems immediately as they’re discovered. Have IT support available and responsive during initial days. Maintain contact with vendors for escalation if needed. Document issues and resolutions for future reference.
Fallback Strategy:
Keep old location internet active for a transition period. Maintain access to old server room if possible. Don’t rush to disconnect everything immediately. Having fallback options provides peace of mind. Consider cost of temporary overlap versus risk of extended downtime.
When to Finally Disconnect:
New location operates successfully for at least several days. All critical issues resolved. Data validated and compared between locations. Backups current and verified at new location.
| Mistake | Impact | Prevention |
| Moving IT same day as furniture | No infrastructure ready, extended downtime | Install infrastructure weeks before move |
| No current backups | Data loss if problems occur | Complete and verify backups before move |
| Inadequate testing in new location | Production problems discovered by users | Thorough pre-move testing |
| Rushing system startup | Configuration errors, system failures | Systematic startup following dependencies |
| Poor documentation | Difficult troubleshooting, extended recovery | Complete documentation before move |
| Single person knowledge | Project stalls if person unavailable | Document everything, involve team |
Professional IT relocation services bring specialized knowledge that general moving companies lack. Understanding of equipment sensitivity and proper handling procedures. Experience with systematic shutdown and startup sequences. Knowledge of how to protect equipment during transport. Familiarity with server room requirements and setup. Coordination skills across IT, facilities, and moving logistics.
Coordination Benefits:
Single point of contact managing all aspects. Coordination between IT teams, movers, and vendors. Timeline management keeping everything on track. Risk identification and mitigation planning. Problem resolution when issues arise.
Communication Management:
Regular updates to stakeholders about progress. Early warning of potential issues or delays. Clear escalation paths for decision-making. Documentation of all activities and decisions.
Systematic Approaches:
Detailed checklists ensuring nothing is forgotten. Established timelines based on project size and complexity. Standardized procedures reducing errors. Quality checks at each phase. Post-move validation before declaring success.
Professional IT relocation requires combining technical knowledge with logistics expertise. Move Solutions has managed IT relocations and office moves for over 35 years, understanding the critical importance of maintaining business operations throughout transitions.
Our IT Relocation Services:
✓ Pre-move planning and coordination: Work with your IT team to plan infrastructure setup and migration timeline
✓ Equipment inventory and labeling: Systematic documentation of all equipment and connections
✓ Professional packing and handling: Climate-controlled transport and proper handling for sensitive equipment
✓ Coordination with IT infrastructure: Flexible scheduling around your system requirements and testing needs
✓ Server and equipment installation: Physical placement and reconnection following your specifications
✓ PC/peripheral services: De-install and re-install workstations and end-user equipment
✓ Property protection: Comprehensive protection of both origin and destination facilities
BrassTacks™ Technology for Visibility:
Our proprietary BrassTacks™ process software provides real-time tracking of your IT relocation. Monitor equipment status, access schedules, and track progress “Anywhere”© through our transparent platform.
Experienced Teams:
Our employed, background-checked teams understand the critical nature of IT infrastructure. We coordinate with your technical staff to ensure proper handling, sequencing, and testing throughout the relocation process.
Comprehensive Service Integration:
We handle more than just physical moving. Our services include furniture installation and reconfiguration, technology equipment handling, property protection, and coordination with your IT and facilities teams. This integration simplifies vendor management and ensures smooth execution.
Stable. Predictable. “Anywhere”©—our three favorite words. We want them to be yours as well.
Planning an IT relocation or office move? Contact Move Solutions today for a comprehensive consultation about your move. Our project managers will work with your IT team to develop a plan that maintains business continuity throughout the transition.
Well-planned office moves with proper IT infrastructure setup can minimize downtime to one weekend or even less for most operations, though some systems may require additional testing time. The key is installing internet, cabling, and infrastructure at the new location weeks before moving equipment, allowing systems to come online quickly once equipment is physically relocated.
Complete elimination of downtime is difficult but organizations can get very close through phased migration approaches where departments move separately, parallel operations running systems at both locations during transition, cloud services and remote work enabling operations during physical moves, and strategic timing scheduling moves during naturally slower business periods.
No, IT equipment should typically move separately from furniture, with infrastructure installed and tested at the new location before moving production equipment. This separation allows network cabling and internet setup to complete first, server room preparation without furniture in the way, testing of infrastructure before equipment arrives, and equipment arriving to fully functional connectivity rather than waiting for installation.
Organizations with continuous operations require phased approaches moving one department or system at a time while others continue operating, parallel systems running at both locations during transition, or cloud migration strategies moving to cloud services before or during physical relocation. These approaches are more complex and costly but maintain business continuity for operations that cannot afford any interruption.
Some highly sensitive equipment may need special consideration including evaluating if equipment can be replaced rather than moved, using specialized transport with shock monitoring and climate control, maintaining equipment in active operation during short-distance moves, or planning equipment refresh cycles to coincide with office relocations, replacing rather than moving aging systems.
Infrastructure preparation at the new location before moving equipment is the single most critical factor because having internet, cabling, phone systems, and server room ready means equipment can come online immediately after physical placement rather than waiting days or weeks for infrastructure installation, which is the primary cause of extended downtime during office relocations.